Q1 MultipleChoice

An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.

Answer the question using a straight line depreciation and a 10% interest rate.

The following question requires your selection of CCC/CCE Scenario 17 (4.2.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.

Assuming a 53% tax rate, how much cumulative depreciation will have been claimed at the end of the grain elevator's life span?

Correct Answer: D
Explanation:

Straight-line depreciation means that the cost of the asset is evenly spread over its useful life. Given that the grain elevator has a cost of $80,000 and a lifespan of 25 years, the cumulative depreciation at the end of its life span would be the entire initial cost of the asset. Since there is no salvage value, the full $80,000 will be depreciated over 25 years. Thus, the correct answer is D. $80,000.

Q2 MultipleChoice

An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.

Answer the question using a straight line depreciation and a 10% interest rate.

Which of the following interest rates disregards the effects of compounding periods that occur more frequent than annually?

Correct Answer: D
Explanation:

The Nominal interest rate is the rate of interest before adjusting for compounding within the year. It disregards the effects of compounding periods that occur more frequently than annually. For instance, a nominal rate of 12% compounded monthly would still be referred to as 12%, without taking into account the fact that the effective annual rate would be higher due to monthly compounding. The other options, such as continuous compounding, simple interest, and minimum attractive rate of return (MARR), do account for compounding or are specific types of interest. Therefore, the correct answer is D. Nominal interest rate.

Q3 MultipleChoice

Which of the following is used for measuring productivity loss?

Correct Answer: C
Explanation:

Productivity loss in projects, particularly in construction, can be measured using various methods. The Earned Value Management (EVM) system includes the Earned Formula to compare the work performed against the work planned.

Key Points:

Earned Formula:

This formula is used in EVM to calculate key performance indicators like the Cost Performance Index (CPI) and Schedule Performance Index (SPI), which help in understanding productivity loss.

By comparing earned value (the work actually performed) against planned value, project managers can assess whether the project is behind or ahead in terms of schedule and budget, indirectly measuring productivity loss.

Other Options:

Central Limit Theorem: This is a statistical concept, not directly used for measuring productivity loss.

Value Engineering: A process that seeks to improve the value of goods or products by using an examination of function, not directly related to measuring productivity loss.

Conclusion: The correct answer is C. Earned formula because it is directly linked to measuring productivity loss in project management through the EVM system.

Q4 MultipleChoice

A used concrete pumping truck can be purchased for $125,000. The operation costs are expected to be $65,000 the first year and increase 5% each year thereafter. As a result of the purchase, the company will see an increase in income of $100,000 the first year and 5% more each subsequent year. The company uses straight-line depreciation. The truck will have a useful life of five (5) years and no salvage value. Management would like to see a 10% return on any investment. The company's tax rate is 28%.

Taxes due at the end of year five (5) would be:

Correct Answer: B
Explanation:

To determine the taxes due at the end of year five, we calculate the income before taxes, subtract the depreciation, and then apply the tax rate of 28%.

Year 5 Income:

Year 1 Income = $100,000

Each subsequent year increases by 5%, so Year 5 Income = $100,000 (1.05)^4 = $121,550.63

Year 5 Operating Costs:

Year 1 Operating Costs = $65,000

Each subsequent year increases by 5%, so Year 5 Operating Costs = $65,000 (1.05)^4 = $78,943.41

Depreciation (Straight-Line):

Depreciation = $125,000 5 = $25,000 per year

Income Before Taxes (Year 5):

IncomeBeforeTaxes=121,550.6378,943.4125,000=17,607.22\text{Income Before Taxes} = 121,550.63 - 78,943.41 - 25,000 = 17,607.22IncomeBeforeTaxes=121,550.6378,943.4125,000=17,607.22

Taxes Due:

TaxesDue=17,607.220.28=4,930.02\text{Taxes Due} = 17,607.22 \times 0.28 = 4,930.02TaxesDue=17,607.220.28=

Q5 MultipleChoice

The process of stating goals and determining the most effective way of reaching them is the definition for:

Correct Answer: D
Explanation:

Planning is the process of stating goals and determining the most effective way of reaching them. In project management, planning involves defining the project scope, objectives, and determining the steps necessary to achieve the desired outcomes. This includes identifying resources, establishing timelines, and creating a strategy to ensure that the project is completed on time, within budget, and to the required quality standards.

Option A: Implementing refers to the execution phase, where the plans are put into action.

Option B: Mission Statement is a brief statement that defines the purpose or core values of an organization but is not a process.

Option C: Managing involves overseeing and coordinating the various aspects of a project, typically during the execution phase.

Thus, D. Planning is the correct answer as it is the process of stating goals and determining the methods to achieve them.

Get access to all 189 verified questions with detailed answers.

Unlock All CCP Questions

Frequently Asked Questions

To be eligible for the CCP exam, you must have a combination of education and experience in cost engineering or project management. AACE International requires a minimum of 8 years of professional experience in cost estimation, cost management, planning, scheduling, or related fields, though this requirement can be reduced with a bachelor's degree or higher.

The CCP exam consists of two parts: Part 1 has 100 multiple-choice questions (2.5 hours) and Part 2 has 50 multiple-choice questions (1.5 hours), for a total of 4 hours of testing time. You must score at least 70% on each part to pass the certification.

The CCP exam covers cost engineering fundamentals, cost estimation, cost management, planning and scheduling, risk management, and value engineering. The exam tests your knowledge across various industries and project types, including capital projects, operations, and maintenance.

The CCP exam fee varies by country and membership status with AACE International, typically ranging from $400-$600 for members and more for non-members. The exam is offered multiple times throughout the year at testing centers worldwide, and you can retake it if you don't pass on your first attempt.

The CCP certification is valid for 5 years from the date you pass the exam. To maintain your certification, you must earn 36 Professional Development Units (PDUs) during the 5-year recertification period through continuing education and professional activities.
Exam Details
  • Exam CodeCCP
  • VendorAACE International
  • Total Questions189
  • Duration300 min
  • LanguageEnglish
  • Last UpdatedSep 5, 2026
4.9/5

Pass CCP First Time

Get all 189 exam questions with verified answers and 90-day free updates.

Buy Now & Pass
  • PDF + Practice Test Bundle
  • 90-Day Free Updates
  • 100% Money-Back Guarantee
  • Instant Download
  • 24/7 Customer Support
99% Pass Rate Trusted by 50,000+ IT professionals