Limited-Time Offer: Enjoy 50% Savings! - Ends In 0d 00h 00m 00s Coupon code: 50OFF
Free Exam Questions

Project-Planning-Design Exam Questions & Answers

ARE 5.0 Project Planning & Design (PPD)  •  NCARB

100 Questions 245 min Updated Sep 2026 99% Pass Rate
Get Full Access

100% money-back guarantee

Sample Project-Planning-Design Questions

Practice with real exam-style questions, each with the verified correct answer and explanation.

Q1 MultipleChoice

In high-rise building construction, which advantages does the use of composite floor decking offer over the use of flat plates? Check the four that apply.

Correct Answer: A, C, D, E
Explanation:

Comprehensive and Detailed Explanation From Exact Extract:

Composite floor decking advantages:

(A) Composite action reinforces slabs, improving strength.

(C) Metal decks serve as working platforms, speeding construction.

(D) Decks act as permanent formwork, eliminating temporary formwork.

(E) Lightweight concrete can be used to reduce structural weight.

(B) Shear connectors are required for composite action, so this is incorrect.

(F) Steel generally increases sound transmission compared to flat plate concrete, so false.


ARE 5.0 PPD -- Building Systems and Assemblies, Structural Systems

The Architect's Handbook of Professional Practice, 15th Edition -- Steel Construction

Q2 MultipleChoice

An architect's client is focused on lighting energy savings and daylighting design in a new 3,000 ft commercial building addition to expand showroom and office square footage. The client requests reasonable daylighting measures in the design.

What should the architect recommend to the client?

Correct Answer: B
Explanation:

Comprehensive and Detailed Explanation From Exact Extract:

Daylight-responsive control systems automatically adjust electric lighting based on available natural light, reducing energy use and improving occupant comfort.

Isolating lighting to a single zone (A) limits effectiveness.

Limiting daylight access (C) reduces benefits.

Increasing sunlight near tasks (D) can cause glare.

Thus, providing daylight-responsive electric lighting control is recommended.


ARE 5.0 PPD -- Environmental Conditions and Context, Daylighting

The Architect's Handbook of Professional Practice, 15th Edition -- Lighting Design

Q3 MultipleChoice

Which of the following is considered when using natural light as the primary source of ambient light to improve building quality and reduce energy costs?

Correct Answer: B
Explanation:

Comprehensive and Detailed Explanation From Exact Extract:

Using natural light as a primary source of ambient lighting is a sustainable strategy to improve indoor environmental quality and reduce energy consumption. However, careful control of daylighting is essential to avoid glare and overheating.

Exterior shading devices (such as louvers, overhangs, and fins) are critical in managing solar heat gain and glare by controlling direct sunlight before it enters the building envelope. They help maintain visual comfort and reduce cooling loads, directly impacting energy costs and occupant comfort.

Operable windows on opposite walls facilitate cross ventilation, which is beneficial for natural ventilation but does not directly control daylighting quality or energy use related to lighting.

Clear glazing window wall systems maximize daylight penetration but can increase solar heat gain if not properly shaded, thus increasing cooling loads.

Single switched lighting controls are a basic electrical feature and do not influence daylighting quality or energy efficiency related to natural light.

NCARB's PPD guidelines emphasize integrating exterior shading as a passive design strategy to optimize daylight use and reduce reliance on mechanical cooling and artificial lighting, improving building performance sustainably.


ARE 5.0 Project Planning & Design -- Environmental Conditions and Context

The Architect's Handbook of Professional Practice, 15th Edition -- Sustainable Design and Daylighting

NCARB Guidelines on Daylighting and Energy Efficiency

Q4 MultipleChoice

Heavy steel columns and rigid connections between columns and beams

Vertical steel trusses in the external walls

Light steel columns and flexible connections between columns and beams

Vertical steel trusses in the internal walls

Which structural design concept minimizes the cost of steel structure needed to resist wind and earthquake loads in high-rise buildings?

Correct Answer: B
Explanation:

Comprehensive and Detailed Explanation From Exact Extract:

Using vertical steel trusses in the external walls (B) allows for efficient lateral load resistance by creating a stiff, braced perimeter that resists wind and seismic forces with less material compared to internal bracing or heavy columns.

Heavy steel columns and rigid connections (A) require more steel and complex joints, increasing cost.

Light steel columns with flexible connections (C) provide less stiffness and require more members.

Internal steel trusses (D) reduce usable space and complicate architectural layouts.

External vertical trusses optimize structural efficiency and cost, as supported in NCARB PPD guidelines for high-rise construction.


ARE 5.0 PPD -- Structural Systems

The Architect's Handbook of Professional Practice, 15th Edition -- Steel Structures

Q5 MultipleChoice

An architect has just received client approval of the Schematic Design documents for a three-story, outpatient medical clinic. The clinic is located within a mixed-use development governed by

a City-approved Planned Development (PD) document. The medical clinic design utilizes standardized departmental layouts and includes outpatient clinics, as well as treatment spaces,

administrative spaces and public/lobby spaces.

The site needs to accommodate four different vehicular traffic flows: patient traffic, staff traffic, service and delivery traffic, and emergency services traffic. In addition, a pedestrian plaza

must connect to the mixed-use development sidewalks. The plaza must provide space for bicycle parking and will serve as the future bus stop.

The site design addresses several challenges related to building orientation. The southeast facade, with excellent visibility from the highway, is the location of all service equipment. The

building entrance faces northwest, convenient to the parking but not visible from the highway.

The client believes future patient volumes will outgrow the clinic. The PD document allows for a planned Phase 2 development on the adjacent vacant site to the southwest. Phase 2 would

include a second building (2 story, 80,000 BGSF) and/or a parking deck.

Other considerations for the project include:

Protected tree requirements are defined in the PD document.

Easy pedestrian access must be provided from Sycamore Boulevard.

All required parking for the clinic must be accommodated on site.

Programmed area includes 109,450 Departmental Gross Square Feet (DGSF) / 130,184 Building Gross Square Feet (BGSF).

Exterior material percentages are dictated by the PD document and shall not exceed specific percentages for Primary and Secondary Finishes.

All service equipment needs to be screened; see PD document for restrictions.

Signage opportunities are important to the client.

Acoustical privacy is a concern of the healthcare system.

The following resources are available for your reference:

Drawings, including a perspective, plans, and exterior elevations

Building Program, including client's departmental program and detailed program for Treatment 01 (Infusion)

Exterior Material Cost Comparisons

Planned Development Document

IBC Excerpts, showing relevant code sections

ADA Excerpts, showing relevant sections from the ADA Standards for Accessible Design

After construction, the owner asks the architect to integrate sustainable features that would offset building operational costs and have minimal changes to the existing design and future development.

Which of the following sustainable features should the architect consider?

Correct Answer: B
Explanation:

Comprehensive and Detailed Explanation From Exact Extract:

Roof-mounted photovoltaic (PV) panels are the most appropriate sustainable feature to offset building operational costs with minimal design changes, especially in a mixed-use development with planned future expansion.

Building-mounted vertical sunshades (A) require design integration and may affect exterior finishes and daylighting.

Ground-mounted PV panels (C) require additional land and site preparation, which could conflict with future development plans and site constraints.

Roof-mounted PV panels maximize use of existing roof space, reduce energy costs, and are relatively easy to integrate with minimal impact on building massing or future phases.


ARE 5.0 PPD -- Environmental Conditions and Context, Renewable Energy

Planned Development Document

Get access to all 100 verified questions with detailed answers.

Unlock All Project-Planning-Design Questions

Frequently Asked Questions

The ARE 5.0 PPD exam is one of six divisions of the Architect Registration Examination (ARE 5.0) administered by NCARB. It tests candidates' knowledge and skills in project planning, site analysis, programming, schematic design, and preliminary design development for architectural projects.

The ARE 5.0 PPD exam is 2 hours and 45 minutes long and contains approximately 80 multiple-choice questions. The exam is computer-based and delivered through Prometric testing centers.

The PPD exam covers five main areas: project and site analysis, programming, schematic design, preliminary design development, and site design. Topics include building codes, zoning regulations, accessibility standards, environmental considerations, and design principles.

NCARB does not publicly disclose the specific passing score for the ARE 5.0 PPD exam, as scores are scaled and adjusted based on exam difficulty. Candidates typically need to demonstrate competency across all major topic areas to pass.

Candidates should study official NCARB resources, take practice exams, review architectural standards and codes, and consider enrolling in ARE prep courses. Most candidates spend 40-60 hours studying and should have practical experience with project planning and design concepts.
Exam Details
  • Exam CodeProject-Planning-Design
  • VendorNCARB
  • Total Questions100
  • Duration245 min
  • LanguageEnglish
  • Last UpdatedSep 3, 2026
4.9/5

Pass Project-Planning-Design First Time

Get all 100 exam questions with verified answers and 90-day free updates.

Buy Now & Pass
  • PDF + Practice Test Bundle
  • 90-Day Free Updates
  • 100% Money-Back Guarantee
  • Instant Download
  • 24/7 Customer Support
99% Pass Rate Trusted by 50,000+ IT professionals